Piling Works for Jimah 2 X 1000 MW Power Plant

Piling Works for Jimah 2 X 1000 MW Power Plant

  • Scope of Work – 638 No. of 600 mm Dia Concrete Spun Piles (30 m Length)
  • Challenge – Installation in underwater conditions, adverse weather, interfacing with other marine equipment in working area

Location

Negri Sembilan, Malaysia