Piling Works for Java 7 2 X 1050 MW Power Plant, Cilegon, Indonesia
Piling Works for Java 7 2 X 1050 MW Power Plant, Cilegon, Indonesia
- Scope of Work – 372 No. of 1000 mm & 1200 mm Dia Steel Pipe Piles (72 m Length)
- Challenge –Long single length, fast-track project
Location
Cilegon, Indonesia