Piling Works for 1 X 1000 MW Tanjung Bin Power Plant
Piling Works for 1 X 1000 MW Tanjung Bin Power Plant
- Scope of Work –462 No. of 914 mm Dia Steel Pipe Piles (48 m Length)
- Challenge –Next to operational jetty, within the vicinity of congested port area, near proximity to existing underwater culvert